0 By Koruza Team In EvolutionPosted August 25, 2014World Wide KORUZA ExperimentWhen KORUZA optical system development has reached the 5th Prototype, it was put on a worldwide test. 10 links have been deployed in order to observe their performance over a 12-month period. READ MORE
0 By Koruza Team In EvolutionPosted August 11, 2014Generation 5 PrototypeThis time, the system in OpenSCAD framework has been redesigned completely. This has prepared the system for collaborative open-source development. READ MORE